This paper presents an approach to select and plan the optimal execution of potential investment activities. The model is composed by a computational part, in the form of a combinatorial optimization problem, coupled with a preference elicitation module used to capture subjective judgments. In particular, the structure of the elicitation module draws from portfolio decision analysis and Multi-Attribute Value Theory and shows how their use can be integrated with a multi-period optimization problem with activities durations and constraints on their overlaps. The problem formulation was inspired by a real-world infrastructure management case in the energy distribution sector and tested on a dataset of more than three hundred activities of improvement of infrastructure conditions. Finally, the approach proposed in this paper is validated by analyzing its results and its robustness concerning the input data of the real-world case study.

Multi-period portfolio decision analysis: A case study in the infrastructure management sector / Gasparini, G.; Brunelli, M.; Chiriac, M. D.. - In: OPERATIONS RESEARCH PERSPECTIVES. - ISSN 2214-7160. - 9:(2022), pp. 10021301-10021310. [10.1016/j.orp.2021.100213]

Multi-period portfolio decision analysis: A case study in the infrastructure management sector

Gasparini G.
;
Brunelli M.;
2022-01-01

Abstract

This paper presents an approach to select and plan the optimal execution of potential investment activities. The model is composed by a computational part, in the form of a combinatorial optimization problem, coupled with a preference elicitation module used to capture subjective judgments. In particular, the structure of the elicitation module draws from portfolio decision analysis and Multi-Attribute Value Theory and shows how their use can be integrated with a multi-period optimization problem with activities durations and constraints on their overlaps. The problem formulation was inspired by a real-world infrastructure management case in the energy distribution sector and tested on a dataset of more than three hundred activities of improvement of infrastructure conditions. Finally, the approach proposed in this paper is validated by analyzing its results and its robustness concerning the input data of the real-world case study.
2022
Gasparini, G.; Brunelli, M.; Chiriac, M. D.
Multi-period portfolio decision analysis: A case study in the infrastructure management sector / Gasparini, G.; Brunelli, M.; Chiriac, M. D.. - In: OPERATIONS RESEARCH PERSPECTIVES. - ISSN 2214-7160. - 9:(2022), pp. 10021301-10021310. [10.1016/j.orp.2021.100213]
File in questo prodotto:
File Dimensione Formato  
Multi-period portfolio decision analysis.pdf

accesso aperto

Tipologia: Versione editoriale (Publisher’s layout)
Licenza: Creative commons
Dimensione 1.31 MB
Formato Adobe PDF
1.31 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11572/327252
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact