The water-energy nexus holds paramount relevance in the context of the transition to a carbon free energy system, being water the only renewable energy source with reliable storage capacity. Modelling hydropower production in a large domain over a long time window represents an open challenge due to a variety of reasons: firstly, high-resolution, large-scale hydrological modelling in a context of uncertainty needs calibration, thus representing a computationally intensive task due to the large domain and time window over which calibration is needed; secondly, as stated by many works in literature, hydropower production modelling and in particular reservoir modelling is a very information-demanding procedure, and excessive simplifications adopted to face the lack of information might lead to consistent bias in the predictions. This thesis can be subdivided into three main parts: firstly, the model that was used to perform every analysis, HYPERstreamHS, will be presented. The model is a continuous, large-scale hydrological model embedding a dual-layer MPI framework (i.e. Message Passing Interface, a common standard in parallel computing) that ensures optimal scalability of the model, greatly reducing the computation time needed. Explicit simulation of water diversions due to hydropower production is also included in the model, and adopts only publicly available information, making the model widely applicable. Secondly, a first validation of the model will be presented, and the adopted approach will be compared with some other approaches commonly found in literature, showing that the inclusion of a high level of detail is crucial to ensure a reliable performance of the model; this first application was performed on the Adige catchment, where extensive information on human systems was available, and allowed to effectively assess which information were indispensable and which, in turn, could be simplified to some extent while preserving model performance. Finally, the model setup has been applied on a relevant portion of the Western Italian Alps; in this case, two different meteorological input forcing data sets were adopted, in order to assess the differences in their performance in terms of hydropower production modelling. This latter study indeed represents a preliminary analysis and will provide stepping stone to extend the modelling framework to the Italian Alpine Region.

Detailed simulation of storage hydropower systems in the Italian Alpine Region / Galletti, Andrea. - (2020 Jun 11), pp. 1-151. [10.15168/11572_266707]

Detailed simulation of storage hydropower systems in the Italian Alpine Region

Galletti, Andrea
2020-06-11

Abstract

The water-energy nexus holds paramount relevance in the context of the transition to a carbon free energy system, being water the only renewable energy source with reliable storage capacity. Modelling hydropower production in a large domain over a long time window represents an open challenge due to a variety of reasons: firstly, high-resolution, large-scale hydrological modelling in a context of uncertainty needs calibration, thus representing a computationally intensive task due to the large domain and time window over which calibration is needed; secondly, as stated by many works in literature, hydropower production modelling and in particular reservoir modelling is a very information-demanding procedure, and excessive simplifications adopted to face the lack of information might lead to consistent bias in the predictions. This thesis can be subdivided into three main parts: firstly, the model that was used to perform every analysis, HYPERstreamHS, will be presented. The model is a continuous, large-scale hydrological model embedding a dual-layer MPI framework (i.e. Message Passing Interface, a common standard in parallel computing) that ensures optimal scalability of the model, greatly reducing the computation time needed. Explicit simulation of water diversions due to hydropower production is also included in the model, and adopts only publicly available information, making the model widely applicable. Secondly, a first validation of the model will be presented, and the adopted approach will be compared with some other approaches commonly found in literature, showing that the inclusion of a high level of detail is crucial to ensure a reliable performance of the model; this first application was performed on the Adige catchment, where extensive information on human systems was available, and allowed to effectively assess which information were indispensable and which, in turn, could be simplified to some extent while preserving model performance. Finally, the model setup has been applied on a relevant portion of the Western Italian Alps; in this case, two different meteorological input forcing data sets were adopted, in order to assess the differences in their performance in terms of hydropower production modelling. This latter study indeed represents a preliminary analysis and will provide stepping stone to extend the modelling framework to the Italian Alpine Region.
11-giu-2020
XXXII
2018-2019
Ingegneria civile, ambientale e mecc (29/10/12-)
Civil, Environmental and Mechanical Engineering
Majone, Bruno
Bellin, Alberto
no
Inglese
Settore ICAR/02 - Costruzioni Idrauliche e Marittime e Idrologia
File in questo prodotto:
File Dimensione Formato  
phd_unitn_Andrea_Galletti.pdf

accesso aperto

Descrizione: Tesi di dottorato
Tipologia: Tesi di dottorato (Doctoral Thesis)
Licenza: Creative commons
Dimensione 23.08 MB
Formato Adobe PDF
23.08 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11572/266707
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact