This paper reports the Trento test setup and the cold test procedure for three triplets (ID: R4, R5, and R6) assembled with RD53A readout cheap and planar sensors. The trim and tuning of Front Ends (FE), as well as sensor I-V measurements, were made for a cold temperature (−25 ◦C) for an applied voltage (−30V for R4, −10V for R5 and R6). As a part of QC, initially, several test scans: analog, digital, threshold, ToT, noise, etc., were performed to evaluate the module response at −25 ◦C before applying a necessary tuning script to find a spatially uniform threshold distribution over the pixel matrix. Later, the crosstalk-based disconnected-bump and X-ray scans were made to check modules’ bump bonding quality and hits per pixel. Results reported here show a good agreement to a qualified triplet module, assuring the Trento cold test setup capacity for the ATLAS ITk QA/QC process.
Cold temperature characterization of ring triplets based on RD53A readout chip / Samy, M. A. A.; Sultan, D. M. S.; Lapertosa, A.; Gariano, G.; Dalla Betta, G. -F.. - In: JOURNAL OF INSTRUMENTATION. - ISSN 1748-0221. - ELETTRONICO. - 17:11(2022). [10.1088/1748-0221/17/11/C11005]
Cold temperature characterization of ring triplets based on RD53A readout chip
Samy, M. A. A.
Primo
;Sultan, D. M. S.Secondo
;Dalla Betta, G. -F.Ultimo
2022-01-01
Abstract
This paper reports the Trento test setup and the cold test procedure for three triplets (ID: R4, R5, and R6) assembled with RD53A readout cheap and planar sensors. The trim and tuning of Front Ends (FE), as well as sensor I-V measurements, were made for a cold temperature (−25 ◦C) for an applied voltage (−30V for R4, −10V for R5 and R6). As a part of QC, initially, several test scans: analog, digital, threshold, ToT, noise, etc., were performed to evaluate the module response at −25 ◦C before applying a necessary tuning script to find a spatially uniform threshold distribution over the pixel matrix. Later, the crosstalk-based disconnected-bump and X-ray scans were made to check modules’ bump bonding quality and hits per pixel. Results reported here show a good agreement to a qualified triplet module, assuring the Trento cold test setup capacity for the ATLAS ITk QA/QC process.File | Dimensione | Formato | |
---|---|---|---|
JINST_2022_4.pdf
Solo gestori archivio
Tipologia:
Versione editoriale (Publisher’s layout)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
1.35 MB
Formato
Adobe PDF
|
1.35 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione