Hydropower plants, in particular High-head Hydropower Plants (HPPs), are an important source of energy also for their role in covering the daily peaks of energy demand. However, HPPs, especially storage power plants, have several negative effects on the ecosystems of downstream watercourses inducing unnatural changes in flow regime (hydropeaking). One way to study ecological implications induced by hydropeaking is represented by the coupling of hydrodynamic models (CFD) with habitat suitability models, in which hydrodynamic parameters are typically used to describe the physical habitat of indicator species. The research activity wanted to investigate possible differences between the use of 2D and 3D CFD approaches to determine the watercourse hydraulic characteristics and their effects on habitat evaluations, performed with CASiMiR software, in complex morphology as usually presents in hydropeaked reaches. In particular the habitat suitability for the two case studies (Valsura River and Rio Selva dei Molini), is analysed comparing different approaches for the reconstruction of the velocity field (depth-averaged velocities from 2D modelling, bottom velocity field reconstruction with log-law approach from 2D modelling and bottom velocity field from 3D modelling). The results show that the habitat suitability index (HSI) using 2D or 3D hydrodynamic models can be significantly different. Considering the entire flow range of hydropeaking events, the habitat simulations with bottom flow velocities from 3D modelling provide suitable habitats over the entire flow range representing the availability of stable suitable habitats. The results from the hydraulics and habitat analyses are used to investigate the effects of a hydropeaking mitigation project on the Valsura River (realization of a compensation bypass tunnel to decrease the peak flow rate and to remodel the up and down flow ramping rates) and on Rio Selva dei Molini (morphological measures to reduce the hydropeaking effects).

Protection infrastructures and methods for reducing the impacts downstream of hydropower plants / Pisaturo, Giuseppe Roberto. - (2017), pp. 1-124.

Protection infrastructures and methods for reducing the impacts downstream of hydropower plants

Pisaturo, Giuseppe Roberto
2017-01-01

Abstract

Hydropower plants, in particular High-head Hydropower Plants (HPPs), are an important source of energy also for their role in covering the daily peaks of energy demand. However, HPPs, especially storage power plants, have several negative effects on the ecosystems of downstream watercourses inducing unnatural changes in flow regime (hydropeaking). One way to study ecological implications induced by hydropeaking is represented by the coupling of hydrodynamic models (CFD) with habitat suitability models, in which hydrodynamic parameters are typically used to describe the physical habitat of indicator species. The research activity wanted to investigate possible differences between the use of 2D and 3D CFD approaches to determine the watercourse hydraulic characteristics and their effects on habitat evaluations, performed with CASiMiR software, in complex morphology as usually presents in hydropeaked reaches. In particular the habitat suitability for the two case studies (Valsura River and Rio Selva dei Molini), is analysed comparing different approaches for the reconstruction of the velocity field (depth-averaged velocities from 2D modelling, bottom velocity field reconstruction with log-law approach from 2D modelling and bottom velocity field from 3D modelling). The results show that the habitat suitability index (HSI) using 2D or 3D hydrodynamic models can be significantly different. Considering the entire flow range of hydropeaking events, the habitat simulations with bottom flow velocities from 3D modelling provide suitable habitats over the entire flow range representing the availability of stable suitable habitats. The results from the hydraulics and habitat analyses are used to investigate the effects of a hydropeaking mitigation project on the Valsura River (realization of a compensation bypass tunnel to decrease the peak flow rate and to remodel the up and down flow ramping rates) and on Rio Selva dei Molini (morphological measures to reduce the hydropeaking effects).
2017
XXIX
2017-2018
Ingegneria civile, ambientale e mecc (29/10/12-)
Civil, Environmental and Mechanical Engineering
Righetti, Maurizio
Dumbser, Michael
no
Inglese
Settore ICAR/01 - Idraulica
Settore AGR/08 - Idraulica Agraria e Sistemazioni Idraulico-Forestali
File in questo prodotto:
File Dimensione Formato  
Phd_thesis_Pisaturo_Giuseppe.pdf

accesso aperto

Tipologia: Tesi di dottorato (Doctoral Thesis)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 7.03 MB
Formato Adobe PDF
7.03 MB Adobe PDF Visualizza/Apri
Disclaimer_Pisaturo.PDF

Solo gestori archivio

Tipologia: Tesi di dottorato (Doctoral Thesis)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 134.86 kB
Formato Adobe PDF
134.86 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11572/368948
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact