This paper presents the results of 20 years of monitoring indoor microclimate conditions inside the Scrovegni Chapel in Padova (Italy). Since the late 1970s, the chapel has been the subject of a series of monitoring to assess the degree of conservation of the frescos and of the building structures. The early studies allowedto operate inthe bestfor what concerns the choice oftheproper instrumentationandtheir positioning. It was thus possible to operate before the beginning of any restoration work measuring values of surface temperature, vertical and horizontal gradients of air temperature and relative humidity. The approach has highlighted the importance of heattransfer as well as exchanges of mass between the indoor air and wall surfaces. A subsequent monitoring period allows to measure the air temperature, humidity and surface temperatures after the restoration works. During the same period, it was commissioned to assess the requirements for the air treatment plant. Monitoring is continuous in time and a reasoned comparison of the different indoor microclimatic conditions, which over the years have been met, is here proposed. These indications suggest possible improvements of the monitoring system and of the management of indoor microclimate. © 2014 Elsevier B.V. All rights reserved.
The Scrovegni Chapel: The results of over 20 years of indoor climate monitoring / Bonacina, Cesare; Baggio, Paolo; Cappelletti, Francesca; Romagnoni, Piercarlo; Stevan, Antonio G.. - In: ENERGY AND BUILDINGS. - ISSN 0378-7788. - 95:(2015), pp. 144-152. [10.1016/j.enbuild.2014.12.018]
The Scrovegni Chapel: The results of over 20 years of indoor climate monitoring
Baggio, Paolo;Romagnoni, Piercarlo;
2015-01-01
Abstract
This paper presents the results of 20 years of monitoring indoor microclimate conditions inside the Scrovegni Chapel in Padova (Italy). Since the late 1970s, the chapel has been the subject of a series of monitoring to assess the degree of conservation of the frescos and of the building structures. The early studies allowedto operate inthe bestfor what concerns the choice oftheproper instrumentationandtheir positioning. It was thus possible to operate before the beginning of any restoration work measuring values of surface temperature, vertical and horizontal gradients of air temperature and relative humidity. The approach has highlighted the importance of heattransfer as well as exchanges of mass between the indoor air and wall surfaces. A subsequent monitoring period allows to measure the air temperature, humidity and surface temperatures after the restoration works. During the same period, it was commissioned to assess the requirements for the air treatment plant. Monitoring is continuous in time and a reasoned comparison of the different indoor microclimatic conditions, which over the years have been met, is here proposed. These indications suggest possible improvements of the monitoring system and of the management of indoor microclimate. © 2014 Elsevier B.V. All rights reserved.File | Dimensione | Formato | |
---|---|---|---|
The-Scrovegni-Chapel-The-results-of-over-20-years-of-indoor-climate-monitoring2015Energy-and-Buildings.pdf
Solo gestori archivio
Tipologia:
Versione editoriale (Publisher’s layout)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
6.19 MB
Formato
Adobe PDF
|
6.19 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione