The aim of this paper is to present a step-by-step procedure for defining an accurate and revised monitoring plan for timber balconies. This methodology was defined and tested on 58 balconies with a timber beam structure but can be adapted to a CLT structure. The primary goal is to evaluate and control fungal decay of the various components, enabling preventive and planned interventions before significant damage occurs. Inspection intervals are determined through a prediction model of the progression of decay. The procedure is divided into three phases: a preliminary study and coding stage; an inspection stage, in which conditions are also assessed through non-destructive testing (NTD); and a post-elaboration stage, which is useful for defining interventions and the monitoring plan. These phases have been updated, standardised, and summarised in a procedural flowchart, with new supporting forms developed. The paper concludes with the application of this procedure to a real case study.
Timber Balcony Monitoring Plan: Review and Step-by-Step Procedure / Salzani, Daniele; Gaspari, Andrea; Piazza, Maurizio; Giongo, Ivan. - (2025), pp. 2936-2945. ( World Conference on Timber Engineering 2025 Brisbane, Australia 22nd June–26th June 2025) [10.52202/080513-0358].
Timber Balcony Monitoring Plan: Review and Step-by-Step Procedure
Salzani, Daniele
Primo
;Gaspari, AndreaSecondo
;Piazza, MaurizioPenultimo
;Giongo, IvanUltimo
2025-01-01
Abstract
The aim of this paper is to present a step-by-step procedure for defining an accurate and revised monitoring plan for timber balconies. This methodology was defined and tested on 58 balconies with a timber beam structure but can be adapted to a CLT structure. The primary goal is to evaluate and control fungal decay of the various components, enabling preventive and planned interventions before significant damage occurs. Inspection intervals are determined through a prediction model of the progression of decay. The procedure is divided into three phases: a preliminary study and coding stage; an inspection stage, in which conditions are also assessed through non-destructive testing (NTD); and a post-elaboration stage, which is useful for defining interventions and the monitoring plan. These phases have been updated, standardised, and summarised in a procedural flowchart, with new supporting forms developed. The paper concludes with the application of this procedure to a real case study.| File | Dimensione | Formato | |
|---|---|---|---|
|
TIMBER BALCONY MONITORING PLAN: REVIEW AND STEP-BY-STEP PROCEDURE.pdf
accesso aperto
Tipologia:
Versione editoriale (Publisher’s layout)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
2.28 MB
Formato
Adobe PDF
|
2.28 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione