Sustainable low emission offshore oil and gas platforms (OOGPs) are expected to comprise a lower number of gas turbine generators (GTGs) and offshore wind turbines integrated with battery energy storage systems (BESS). This combination faces challenges with the traditional platform loads, i.e. heavy induction motors (IMs), that are started directly on-line. They draw high inrush currents resulting in voltage sags affecting other loads connected to the common bus. These sags could activate a Low-voltage ride-through control scheme on wind turbines (WTs) and dissipate the generated wind power into a dynamic brake resistor (DBR) while regulating the grid voltage. Improper control coordination of the GTGs, WTs, and BESS could either fail or delay the motor start-up, with a detrimental impact on the industrial process. Considering the above, this paper proposes a Cooperative Control (CoC) strategy of BESS, WTs, and GTGs for the efficient starting of heavy motors with reduced loss of generated wind power. The proposed control strategy is simulated utilizing MATLAB for a real industrial scenario, and the results are discussed.

Co-operative Control of BESS and Wind Turbines for Heavy Motor Starting on Industrial Isolated Grids / Banda, J.K., Adeyemo, A.A., Marra, F., Tedeschi, E.. - (2023), pp. 192-198. (11th International Conference on Power Electronics - ECCE Asia, ICPE 2023-ECCE Asia kor 2023) [10.23919/ICPE2023-ECCEAsia54778.2023.10213912].

Co-operative Control of BESS and Wind Turbines for Heavy Motor Starting on Industrial Isolated Grids

Tedeschi E.
Ultimo
2023-01-01

Abstract

Sustainable low emission offshore oil and gas platforms (OOGPs) are expected to comprise a lower number of gas turbine generators (GTGs) and offshore wind turbines integrated with battery energy storage systems (BESS). This combination faces challenges with the traditional platform loads, i.e. heavy induction motors (IMs), that are started directly on-line. They draw high inrush currents resulting in voltage sags affecting other loads connected to the common bus. These sags could activate a Low-voltage ride-through control scheme on wind turbines (WTs) and dissipate the generated wind power into a dynamic brake resistor (DBR) while regulating the grid voltage. Improper control coordination of the GTGs, WTs, and BESS could either fail or delay the motor start-up, with a detrimental impact on the industrial process. Considering the above, this paper proposes a Cooperative Control (CoC) strategy of BESS, WTs, and GTGs for the efficient starting of heavy motors with reduced loss of generated wind power. The proposed control strategy is simulated utilizing MATLAB for a real industrial scenario, and the results are discussed.
2023
ICPE 2023-ECCE Asia - 11th International Conference on Power Electronics - ECCE Asia: Green World with Power Electronics
Piscataway, New Jersey, U.S
Institute of Electrical and Electronics Engineers Inc.
978-89-5708-350-5
Banda, J. K.; Adeyemo, A. A.; Marra, F.; Tedeschi, E.
Co-operative Control of BESS and Wind Turbines for Heavy Motor Starting on Industrial Isolated Grids / Banda, J.K., Adeyemo, A.A., Marra, F., Tedeschi, E.. - (2023), pp. 192-198. (11th International Conference on Power Electronics - ECCE Asia, ICPE 2023-ECCE Asia kor 2023) [10.23919/ICPE2023-ECCEAsia54778.2023.10213912].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11572/433459
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex 4
social impact