According to the plans of one of the global oil and gas (OG) industry leaders, the integration of offshore wind power into offshore OG platforms will become reality within the next three years. Although this implementation is going to set the standards for a cleaner platform operation, the intermittency of wind power generation does not favor the provision of scheduled constant and reliable power for the loads. To cope with this limitation, this paper proposes a configuration that integrates a Battery Energy Storage System (BESS) in the OG platform. The manuscript focuses on how to appropriately size the BESS through a techno-economic study that considers both investment and operation costs, along with the possibility for economic benefits in terms of fuel savings and CO2 emissions reductions. The results, obtained using aggregated field data from a real platform, indicate that the sized BESS enables fuel savings and higher levels of wind power penetration. This confirms the intuition that BESSs may positively contribute towards renewable-based offshore OG platforms.

Techno-Economic Evaluation of the Sizing and Operation of Battery Storage for Isolated Oil and Gas Platforms with High Wind Power Penetration / Chapaloglou, S.; Varagnolo, D.; Tedeschi, E.. - 2019-:(2019), pp. 4587-4592. (Intervento presentato al convegno 45th Annual Conference of the IEEE Industrial Electronics Society, IECON 2019 tenutosi a Lisbon Congress Center, Portogallo nel 14-17 ottobre. 2019) [10.1109/IECON.2019.8926739].

Techno-Economic Evaluation of the Sizing and Operation of Battery Storage for Isolated Oil and Gas Platforms with High Wind Power Penetration

Tedeschi E.
2019-01-01

Abstract

According to the plans of one of the global oil and gas (OG) industry leaders, the integration of offshore wind power into offshore OG platforms will become reality within the next three years. Although this implementation is going to set the standards for a cleaner platform operation, the intermittency of wind power generation does not favor the provision of scheduled constant and reliable power for the loads. To cope with this limitation, this paper proposes a configuration that integrates a Battery Energy Storage System (BESS) in the OG platform. The manuscript focuses on how to appropriately size the BESS through a techno-economic study that considers both investment and operation costs, along with the possibility for economic benefits in terms of fuel savings and CO2 emissions reductions. The results, obtained using aggregated field data from a real platform, indicate that the sized BESS enables fuel savings and higher levels of wind power penetration. This confirms the intuition that BESSs may positively contribute towards renewable-based offshore OG platforms.
2019
IECON Proceedings (Industrial Electronics Conference)
New York
Institute of Electrical and Electronics Engineers (IEEE)
978-1-7281-4878-6
Chapaloglou, S.; Varagnolo, D.; Tedeschi, E.
Techno-Economic Evaluation of the Sizing and Operation of Battery Storage for Isolated Oil and Gas Platforms with High Wind Power Penetration / Chapaloglou, S.; Varagnolo, D.; Tedeschi, E.. - 2019-:(2019), pp. 4587-4592. (Intervento presentato al convegno 45th Annual Conference of the IEEE Industrial Electronics Society, IECON 2019 tenutosi a Lisbon Congress Center, Portogallo nel 14-17 ottobre. 2019) [10.1109/IECON.2019.8926739].
File in questo prodotto:
File Dimensione Formato  
2019_Techno_Economic_Evaluation_ESS_IECON19.pdf

Solo gestori archivio

Tipologia: Versione editoriale (Publisher’s layout)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 697 kB
Formato Adobe PDF
697 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11572/272866
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 14
  • ???jsp.display-item.citation.isi??? 4
social impact