In the recharge.green project the work package (WP) 6 was dedicated to test the instruments and models that were developed during the recharge.green project in differently structured pilot areas and for different renewable energy (RE) sources. Six pilot areas chose different RE according to the availability of the source: 1 Triglav National Park Slovenia forest biomass, 2 Piemont (PNAM) Italy forest biomass and hydropower, 3 Regione Veneto (Mis and Maè valley) Italy forest biomass and hydropower, 4 Bavaria Germany hydropower, 5 Vorarlberg Austria forest biomass, hydropower, solar, wind, 6 Megève, Valloire, Belledonne France hydropower later National Park Vercors. The report described the work carried out in the pilot areas.
RECHARGE.GREEN PROJECT ACTIVITIES IN PILOT AREAS – TESTING AND IMPLEMENTATION (WP6 lead partner report) / Balest, Jessica; Curetti, Giorgio; Garegnani, Giulia; Grilli, Gianluca; Gros, Julie; D’Alonzo, Valentina; Paletto, Alessandro; Ciolli, Marco; Geri, Francesco; Geitner, Clemens; Hastik, Richard; Leduc, Sylvain; Bertin, Simone; Miotello, Francesca; Zangrando, Erica; Pettenella, Davide; Portaccio, Alessia; Petrinjak, Alenka; Pisek, Rok; Poljanec, Aleš; Kralj, Tomaž; Vrščaj, Borut. - ELETTRONICO. - (2015), pp. 1-65.
RECHARGE.GREEN PROJECT ACTIVITIES IN PILOT AREAS – TESTING AND IMPLEMENTATION (WP6 lead partner report)
Grilli, Gianluca;Ciolli, Marco;Geri, Francesco;
2015-01-01
Abstract
In the recharge.green project the work package (WP) 6 was dedicated to test the instruments and models that were developed during the recharge.green project in differently structured pilot areas and for different renewable energy (RE) sources. Six pilot areas chose different RE according to the availability of the source: 1 Triglav National Park Slovenia forest biomass, 2 Piemont (PNAM) Italy forest biomass and hydropower, 3 Regione Veneto (Mis and Maè valley) Italy forest biomass and hydropower, 4 Bavaria Germany hydropower, 5 Vorarlberg Austria forest biomass, hydropower, solar, wind, 6 Megève, Valloire, Belledonne France hydropower later National Park Vercors. The report described the work carried out in the pilot areas.File | Dimensione | Formato | |
---|---|---|---|
22_WP6_Final_Report_-pilotareas.pdf
accesso aperto
Descrizione: Report di ricerca del Work Package 6 del progetto recharge.green
Tipologia:
Versione editoriale (Publisher’s layout)
Licenza:
Creative commons
Dimensione
3.88 MB
Formato
Adobe PDF
|
3.88 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione