This paper summarizes the challenges and problems faced in designing, building and authorizing for operation of a novel cascade anaerobic digestion plant introducing a novel analytical method. For the R&D plant itself problems are mostly associated with preliminary unknown substrate characteristics and sizing whereas the challenges are mostly of administrative nature, i.e. authorizations and location. For the analytical method the problems and challenges are the application of an analytical method to a new field of application.

Innovative biogas multi-stage R&D plant – preliminary project experiences

Ragazzi, Marco;Foladori, Paola;Rada, Elena Cristina;
2011-01-01

Abstract

This paper summarizes the challenges and problems faced in designing, building and authorizing for operation of a novel cascade anaerobic digestion plant introducing a novel analytical method. For the R&D plant itself problems are mostly associated with preliminary unknown substrate characteristics and sizing whereas the challenges are mostly of administrative nature, i.e. authorizations and location. For the analytical method the problems and challenges are the application of an analytical method to a new field of application.
2011
XIII International Waste Management and Landfill Symposium
Padova
CISA-Environmental Sanitary Engineering Centre
9788862650007
F., Moedinger; F., Ast; Ragazzi, Marco; Foladori, Paola; Rada, Elena Cristina; R., Binnig
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11572/88556
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact